Objects of NDT:
2.3. Parts and assemblies, gas equipment
The provisions of SP 42-101-2003 apply to newly constructed and reconstructed gas distribution systems, the rules and regulations for the design and construction of which are regulated by SNiP 42-01. This SP contains general provisions regarding the use of steel and polyethylene pipes. Features of the design, construction of new and reconstruction of worn-out gas pipelines are given in SP 42-102 "Design and construction of gas pipelines from metal pipes" and SP 42-103 "Design and construction of gas pipelines from polyethylene pipes and reconstruction of worn-out gas pipelines", respectively.
Compliance with areas of accreditation:
Objects of control: 2, 2.1.2, 2.2, 2.3